06.03.19 - Looking down from the roof. The concrete from Friday has dried and the covers are off the queues.
Looking down from the roof. The concrete from Friday has dried and the covers are off the queues. 06.03.19
06.03.19 - Also the lights being tested.  In the foreground finishing pavers for the tram stop area.
Also the lights being tested. In the foreground finishing pavers for the tram stop area. 06.03.19
06.03.19 - No change on the fencing.
No change on the fencing. 06.03.19
06.03.19 -
06.03.19
06.03.19 - Noticed barriers to reach the floors of the new structure (not sure if those were there Friday since I did not go to th e roof).
Noticed barriers to reach the floors of the new structure (not sure if those were there Friday since I did not go to th e roof). 06.03.19
06.03.19 -
06.03.19
06.03.19 - Lights were on this cloudy morning.
Lights were on this cloudy morning. 06.03.19
06.03.19 - Looking down at the Tram stop area.
Looking down at the Tram stop area. 06.03.19
06.03.19 - The work was focused on the far side this morning.
The work was focused on the far side this morning. 06.03.19
06.03.19 - Pavers installed to the tram way.  Looks like gates going in along the tram way and security poles on the far side.
Pavers installed to the tram way. Looks like gates going in along the tram way and security poles on the far side. 06.03.19
06.03.19 - Pavers installed at the base of the escalators.
Pavers installed at the base of the escalators. 06.03.19
06.03.19 - Crews starting to install fencing at the tram drop off area.
Crews starting to install fencing at the tram drop off area. 06.03.19
06.03.19 - A closer look
A closer look 06.03.19
06.03.19 -
06.03.19
06.03.19 - A wider look at the area
A wider look at the area 06.03.19
06.03.19 - Fencing going in around the support columns and the gates at the bag check.
Fencing going in around the support columns and the gates at the bag check. 06.03.19
06.03.19 - On the far side of the left side work on the tramway and pedestrian path.
On the far side of the left side work on the tramway and pedestrian path. 06.03.19
06.03.19 - A closer look. The tram way has been poured and doors set up on the walkway.  Guessing this will be the temporary walkway till the bridge is open then it will become an emergency exit.
A closer look. The tram way has been poured and doors set up on the walkway. Guessing this will be the temporary walkway till the bridge is open then it will become an emergency exit. 06.03.19
06.03.19 - Fencing along the sidewalk on Magic Way.
Fencing along the sidewalk on Magic Way. 06.03.19
06.03.19 -
06.03.19
06.03.19 - Paver work by the elevators.
Paver work by the elevators. 06.03.19
06.03.19 - Another view of the new fencing taking shape.
Another view of the new fencing taking shape. 06.03.19
06.03.19 - A closer look at the gates and bag check tables.
A closer look at the gates and bag check tables. 06.03.19
06.03.19 - The escalator structure.  Notice side paneling on  the 5th floor one now.
The escalator structure. Notice side paneling on the 5th floor one now. 06.03.19
06.03.19 - Panels going in around the perimeter.
Panels going in around the perimeter. 06.03.19
06.03.19 - A closer look at the 3rd floor.
A closer look at the 3rd floor. 06.03.19
06.03.19 -
06.03.19
06.03.19 - From the escalator.
From the escalator. 06.03.19
06.03.19 - The new tram way from here.
The new tram way from here. 06.03.19
06.03.19 -
06.03.19