05.31.19 - Starting off looking down toward the tram pick  up area from the 5th floor of the Mickey and Friendds Parking Structure.  Freshly poured concrete on the tramway.
Starting off looking down toward the tram pick up area from the 5th floor of the Mickey and Friendds Parking Structure. Freshly poured concrete on the tramway. 05.31.19
05.31.19 - At the stop lights have been added.  The fencing is covered to protect it during the construction.
At the stop lights have been added. The fencing is covered to protect it during the construction. 05.31.19
05.31.19 - A closer look at the new concrete.  this will be the tramway from the load zones.
A closer look at the new concrete. this will be the tramway from the load zones. 05.31.19
05.31.19 - Looks like concrete has been poured into the structure now.
Looks like concrete has been poured into the structure now. 05.31.19
05.31.19 - The fencing for this area is being painted.
The fencing for this area is being painted. 05.31.19
05.31.19 - Looking between the two garages.
Looking between the two garages. 05.31.19
05.31.19 - Crews and equipment moving about the new garage.
Crews and equipment moving about the new garage. 05.31.19
05.31.19 -
05.31.19
05.31.19 - The connection span between the two gargaes.  Note they are installing a higher barrier on the side facing the tram stop that will also be the pedestrian walkway.
The connection span between the two gargaes. Note they are installing a higher barrier on the side facing the tram stop that will also be the pedestrian walkway. 05.31.19
05.31.19 - Looking straight down they are doing landscaping installation adjacent to the Mickey and Friends Parking structure.
Looking straight down they are doing landscaping installation adjacent to the Mickey and Friends Parking structure. 05.31.19
05.31.19 -
05.31.19
05.31.19 - A look at the current tram stop area.
A look at the current tram stop area. 05.31.19
05.31.19 - The first sections of paver installation are complete.
The first sections of paver installation are complete. 05.31.19
05.31.19 - The shade structure roof looks finished.
The shade structure roof looks finished. 05.31.19
05.31.19 - Railings are being installed around the support columns.
Railings are being installed around the support columns. 05.31.19
05.31.19 - Paver installation is done here and fencing is going up.
Paver installation is done here and fencing is going up. 05.31.19
05.31.19 - A closer look at the new fencing. Looks to be a gate going in here too.
A closer look at the new fencing. Looks to be a gate going in here too. 05.31.19
05.31.19 - This is interesting.  The pavers are on the concrete base in this section.  They are not cut so assuming they will continue on but over a compacted base vs the concrete (they used compacted base under the shade structure too).  The concrete base appears to be used for a driveway or added support for portions.
This is interesting. The pavers are on the concrete base in this section. They are not cut so assuming they will continue on but over a compacted base vs the concrete (they used compacted base under the shade structure too). The concrete base appears to be used for a driveway or added support for portions. 05.31.19
05.31.19 -
05.31.19
05.31.19 - On hte far side pavers are being installed.
On hte far side pavers are being installed. 05.31.19
05.31.19 - Panning left pavers have been installed around the escalators.
Panning left pavers have been installed around the escalators. 05.31.19
05.31.19 - Most of the paneling has been installed on this face of the escalators and walkways.
Most of the paneling has been installed on this face of the escalators and walkways. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Pavers have also been installed in this area to the left of the escalators.
Pavers have also been installed in this area to the left of the escalators. 05.31.19
05.31.19 - A closer look.  Notice there appears to be seating around the palm tree.
A closer look. Notice there appears to be seating around the palm tree. 05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19
05.31.19 - You can see the start of the fencing just past the supports.  That tramway will be out there.  the forklift is actually out on Magic Way in this picture.
You can see the start of the fencing just past the supports. That tramway will be out there. the forklift is actually out on Magic Way in this picture. 05.31.19
05.31.19 -
05.31.19
05.31.19 - The pavers come up to the tram drop off area.
The pavers come up to the tram drop off area. 05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19
05.31.19 - Plants have been installed along the main structure
Plants have been installed along the main structure 05.31.19
05.31.19 -
05.31.19
05.31.19 - A closer look.
A closer look. 05.31.19
05.31.19 - The ones on the top look to be set up to fill in and block the view.
The ones on the top look to be set up to fill in and block the view. 05.31.19
05.31.19 - The gates are being added to the security area on the first floor, these will open for bag check queues.
The gates are being added to the security area on the first floor, these will open for bag check queues. 05.31.19
05.31.19 - A closer look, you can see the bag check tables on the other side of the gate/fence.
A closer look, you can see the bag check tables on the other side of the gate/fence. 05.31.19
05.31.19 - A wider view of the new structure.
A wider view of the new structure. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Let us take a closer look at the left hand side.
Let us take a closer look at the left hand side. 05.31.19
05.31.19 - Here you can see the curbs for the tram way and planters taking shape.
Here you can see the curbs for the tram way and planters taking shape. 05.31.19
05.31.19 - This concrete appears to be the future walkway to Magic Way (guessing this will be an emergency exit path once the bridge opens but will be the primary until then).
This concrete appears to be the future walkway to Magic Way (guessing this will be an emergency exit path once the bridge opens but will be the primary until then). 05.31.19
05.31.19 -
05.31.19
05.31.19 - Heading down the escalator.
Heading down the escalator. 05.31.19
05.31.19 - A better view of the fencing and gates on this side.
A better view of the fencing and gates on this side. 05.31.19
05.31.19 - Here you can see how the pavers go up to the new concrete.
Here you can see how the pavers go up to the new concrete. 05.31.19
05.31.19 -
05.31.19
05.31.19 - A closer look at the new panels being added to the connection span walkway.
A closer look at the new panels being added to the connection span walkway. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Youo can see the landscaping from this near ground level view.
Youo can see the landscaping from this near ground level view. 05.31.19
05.31.19 - The connection spans from ground level.
The connection spans from ground level. 05.31.19
05.31.19 -
05.31.19
05.31.19 - A closer look at the roof structure.
A closer look at the roof structure. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Looking up at the roof structure for the escalator area.
Looking up at the roof structure for the escalator area. 05.31.19
05.31.19 -
05.31.19
05.31.19 - A closer look.
A closer look. 05.31.19
05.31.19 - A look across Magic Way at where the bridge will eventually connect.
A look across Magic Way at where the bridge will eventually connect. 05.31.19
05.31.19 - The ramp to/from the new bridge is taking shape in the former Downtown Disney parking area.
The ramp to/from the new bridge is taking shape in the former Downtown Disney parking area. 05.31.19
05.31.19 - A closer look at this ramp.
A closer look at this ramp. 05.31.19
05.31.19 - Looking back across Magic Way.
Looking back across Magic Way. 05.31.19
05.31.19 -
05.31.19
05.31.19 - The large trees have all returned.  They are working on the sidewalk and other landscaping.
The large trees have all returned. They are working on the sidewalk and other landscaping. 05.31.19
05.31.19 - Signage is installed in the new structure.
Signage is installed in the new structure. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Scaffolding and temporary supports are up as the new walkway ramp takes shape.
Scaffolding and temporary supports are up as the new walkway ramp takes shape. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Here you can see it curving back toward Disneyland Drive and descending.
Here you can see it curving back toward Disneyland Drive and descending. 05.31.19
05.31.19 -
05.31.19
05.31.19 - Looking across the street at where the bridge will connect.
Looking across the street at where the bridge will connect. 05.31.19
05.31.19 - The Magic Way entrance to the structure is taking shape.
The Magic Way entrance to the structure is taking shape. 05.31.19
05.31.19 - From the Monorail let us check out the project.  A large pit has been dug closer to the station in the former parking lot.
From the Monorail let us check out the project. A large pit has been dug closer to the station in the former parking lot. 05.31.19
05.31.19 - A row of trees and some lights were left but everything else removed.
A row of trees and some lights were left but everything else removed. 05.31.19
05.31.19 - In the distance you can see the new walkway ramp and beyond it the new garage.
In the distance you can see the new walkway ramp and beyond it the new garage. 05.31.19
05.31.19 -
05.31.19
05.31.19 - From the Pixar Pal-A-Round.
From the Pixar Pal-A-Round. 05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19
05.31.19 - A look after dark, some of the ground level lights were on this evening.
A look after dark, some of the ground level lights were on this evening. 05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19
05.31.19 -
05.31.19