05.25.18 - A look over the site from near the escalators
A look over the site from near the escalators 05.25.18
05.25.18 - More forms have been staged.
More forms have been staged. 05.25.18
05.25.18 - On the far side along Magic Way the trees that were boxed up have been moved.
On the far side along Magic Way the trees that were boxed up have been moved. 05.25.18
05.25.18 -
05.25.18
05.25.18 -
05.25.18
05.25.18 - More markers have been placed throughout the site.
More markers have been placed throughout the site. 05.25.18
05.25.18 - None of the earth moving equipment was being used this afternoon.
None of the earth moving equipment was being used this afternoon. 05.25.18
05.25.18 - Work has begun on the far side of the site.
Work has begun on the far side of the site. 05.25.18
05.25.18 - They have started to install the support columns for the wall nearest the Mickey and Friends Parking Structure.
They have started to install the support columns for the wall nearest the Mickey and Friends Parking Structure. 05.25.18
05.25.18 - Looks to be rebar for the walls and columns.
Looks to be rebar for the walls and columns. 05.25.18
05.25.18 -
05.25.18
05.25.18 -
05.25.18
05.25.18 -
05.25.18
05.25.18 - Crews were drilling holes and inserting rebar columns into the concrete.
Crews were drilling holes and inserting rebar columns into the concrete. 05.25.18
05.25.18 - Here they are preparing to lower a rebar column into a recently dug hole.
Here they are preparing to lower a rebar column into a recently dug hole. 05.25.18
05.25.18 - Preparing these columns for concrete.
Preparing these columns for concrete. 05.25.18
05.25.18 -
05.25.18
05.25.18 - Holes covered throughout the area where they had already sunk rebar columns for the foundation work.
Holes covered throughout the area where they had already sunk rebar columns for the foundation work. 05.25.18
05.25.18 - A closer look at the drill. The hose was connected to a pump where they were pouring concrete that was then put into the hole.
A closer look at the drill. The hose was connected to a pump where they were pouring concrete that was then put into the hole. 05.25.18
05.25.18 - Here you can see covers for other holes that have been dug.
Here you can see covers for other holes that have been dug. 05.25.18
05.25.18 - Here you can see the team lowering the rebar column
Here you can see the team lowering the rebar column 05.25.18