05.17.19 - An overview of the tram stop area.
An overview of the tram stop area. 05.17.19
05.17.19 - More concrete is poured to separate the paver sections at the base.  The roof looks to be complete too.
More concrete is poured to separate the paver sections at the base. The roof looks to be complete too. 05.17.19
05.17.19 - Not much change along the temporary walkway.
Not much change along the temporary walkway. 05.17.19
05.17.19 - The shade structure for the bag check queues is receiving its roof.
The shade structure for the bag check queues is receiving its roof. 05.17.19
05.17.19 - More pavers being installed.
More pavers being installed. 05.17.19
05.17.19 - A closer look at the roof work.
A closer look at the roof work. 05.17.19
05.17.19 -
05.17.19
05.17.19 - A team working on the cover for the stair case.
A team working on the cover for the stair case. 05.17.19
05.17.19 - A closer look.
A closer look. 05.17.19
05.17.19 - Closer to the structure more paver preparations.
Closer to the structure more paver preparations. 05.17.19
05.17.19 - Inside the new structure pavers are being installed and the start of the fence.
Inside the new structure pavers are being installed and the start of the fence. 05.17.19
05.17.19 - The near stair case looks complete.
The near stair case looks complete. 05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 - Still no paneling up on the escalators or connection span.
Still no paneling up on the escalators or connection span. 05.17.19
05.17.19 -
05.17.19
05.17.19 - A closer look at the escalator area.
A closer look at the escalator area. 05.17.19
05.17.19 - A better view of the roof work.
A better view of the roof work. 05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 - Moving to the other side of the connection span you can see the new tram stop is taking shape.
Moving to the other side of the connection span you can see the new tram stop is taking shape. 05.17.19
05.17.19 - Individual queue lanes for each row.
Individual queue lanes for each row. 05.17.19
05.17.19 - And seating behind the queues.
And seating behind the queues. 05.17.19
05.17.19 - A fenced in area taking shape.
A fenced in area taking shape. 05.17.19
05.17.19 - Materials staged on the driveway waiting to be installed.
Materials staged on the driveway waiting to be installed. 05.17.19
05.17.19 -
05.17.19
05.17.19 - Back to the tram stop.  Looks like conduit, probably for a sign.
Back to the tram stop. Looks like conduit, probably for a sign. 05.17.19
05.17.19 -
05.17.19
05.17.19 - Heading down the escalator.
Heading down the escalator. 05.17.19
05.17.19 -
05.17.19
05.17.19 - From ground level.
From ground level. 05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 - Looking up at the roof.
Looking up at the roof. 05.17.19
05.17.19 - Looks like a planter taking shape.
Looks like a planter taking shape. 05.17.19
05.17.19 -
05.17.19
05.17.19 - A closer look at the interior of the structure.
A closer look at the interior of the structure. 05.17.19
05.17.19 - The first support columns have risen up for the bridge and walkway that will span Magic Way.
The first support columns have risen up for the bridge and walkway that will span Magic Way. 05.17.19
05.17.19 - Here is the connection on the structure side.
Here is the connection on the structure side. 05.17.19
05.17.19 - Looking across the street.
Looking across the street. 05.17.19
05.17.19 -
05.17.19
05.17.19 - Looking back, trees are being added along Magic Way.
Looking back, trees are being added along Magic Way. 05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 - A closer look at the new supports on the Downtown Disney side.
A closer look at the new supports on the Downtown Disney side. 05.17.19
05.17.19 -
05.17.19
05.17.19 - A closer look at the Structure side.
A closer look at the Structure side. 05.17.19
05.17.19 - From the Pixar Pal-A-Round.
From the Pixar Pal-A-Round. 05.17.19
05.17.19 -
05.17.19
05.17.19 -
05.17.19
05.17.19 - The section of parking lot parallel & closest to Disneyland Drive has been cleared.  This will be where the walkway will go.
The section of parking lot parallel & closest to Disneyland Drive has been cleared. This will be where the walkway will go. 05.17.19
05.17.19 - The stair case lights were on as I left.
The stair case lights were on as I left. 05.17.19
05.17.19 -
05.17.19
Back to previous page