05.11.18 - We start off today at the far side of the site, on the right is Walnut St.  They have started to dig here.  Looks like utility work.
We start off today at the far side of the site, on the right is Walnut St. They have started to dig here. Looks like utility work. 05.11.18
05.11.18 - Looking to the left across the now cleared Pinocchio Parking lot.
Looking to the left across the now cleared Pinocchio Parking lot. 05.11.18
05.11.18 - A closer look at the items staged along the fenceline.
A closer look at the items staged along the fenceline. 05.11.18
05.11.18 - A closer look at the current hole that has been started.
A closer look at the current hole that has been started. 05.11.18
05.11.18 - You can see white lines for where they will be digging.
You can see white lines for where they will be digging. 05.11.18
05.11.18 -
05.11.18
05.11.18 - A line of sprinklers, but they were not on this week.
A line of sprinklers, but they were not on this week. 05.11.18
05.11.18 - Interesting, looks like a path or a road carved out in the cleared site.
Interesting, looks like a path or a road carved out in the cleared site. 05.11.18
05.11.18 - Almost all of the equipment was parked near the tram stop and not in use this afternoon.
Almost all of the equipment was parked near the tram stop and not in use this afternoon. 05.11.18
05.11.18 - A line of survey markers.
A line of survey markers. 05.11.18
05.11.18 - The markers lead to the gate that lines up with the Disneyland Hotel entrance.
The markers lead to the gate that lines up with the Disneyland Hotel entrance. 05.11.18
05.11.18 -
05.11.18
05.11.18 - Forms are being staged along the structure.  These appear to be for support columns.
Forms are being staged along the structure. These appear to be for support columns. 05.11.18
05.11.18 -
05.11.18
05.11.18 - Looks like electrical equipment being installed on the concrete pad we noticed last week.
Looks like electrical equipment being installed on the concrete pad we noticed last week. 05.11.18
05.11.18 - This was from near the elevators.
This was from near the elevators. 05.11.18
05.11.18 - A better look at the pathway.
A better look at the pathway. 05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 - One more look before moving on.
One more look before moving on. 05.11.18
05.11.18 - Today walked to the park for the first time on the new path for me.
Today walked to the park for the first time on the new path for me. 05.11.18
05.11.18 -
05.11.18
05.11.18 - The tall trees that line Magic Way are being boxed up to be relocated.
The tall trees that line Magic Way are being boxed up to be relocated. 05.11.18
05.11.18 -
05.11.18
05.11.18 - A safety sign on the gate where the old exit to Magic Way was.
A safety sign on the gate where the old exit to Magic Way was. 05.11.18
05.11.18 - A portion of the Lilo lot is being used for the construction offices and form prepartion staging.
A portion of the Lilo lot is being used for the construction offices and form prepartion staging. 05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 -
05.11.18
05.11.18 - On the far side looks like some pre-cast concrete staged and ready to go.
On the far side looks like some pre-cast concrete staged and ready to go. 05.11.18