05.03.19 - This is the connection span between the two garages in the back.
This is the connection span between the two garages in the back. 05.03.19
05.03.19 - Signage is installed.
Signage is installed. 05.03.19
05.03.19 - Looks like dirt for landscaping work is stage in the driveway.
Looks like dirt for landscaping work is stage in the driveway. 05.03.19
05.03.19 - Looking across at the new structure from the 3rd floor.
Looking across at the new structure from the 3rd floor. 05.03.19
05.03.19 - on the ground level you can see they are installing steel to support paneling or fences.
on the ground level you can see they are installing steel to support paneling or fences. 05.03.19
05.03.19 - Looking up the driveway between the two garages.
Looking up the driveway between the two garages. 05.03.19
05.03.19 -
05.03.19
05.03.19 - Work continues on the exterior of the structure.
Work continues on the exterior of the structure. 05.03.19
05.03.19 - Inside more signage and looks like the spaces have been striped.
Inside more signage and looks like the spaces have been striped. 05.03.19
05.03.19 -
05.03.19
05.03.19 - The gaps between sections of the garage are not finished yet.
The gaps between sections of the garage are not finished yet. 05.03.19
05.03.19 -
05.03.19
05.03.19 - In the foreground are pavers for the tram stop/security areas, in the background a tram stop taking shape.
In the foreground are pavers for the tram stop/security areas, in the background a tram stop taking shape. 05.03.19
05.03.19 - Crews working on the structure.
Crews working on the structure. 05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 - A better view of the tram stop.  Looks like each row will get its own boarding lane.
A better view of the tram stop. Looks like each row will get its own boarding lane. 05.03.19
05.03.19 - This will be the front of the tram, no ramp at this stop.
This will be the front of the tram, no ramp at this stop. 05.03.19
05.03.19 - The tramway will go through here.  The top will be a stop and next to it a passing lane it appears.
The tramway will go through here. The top will be a stop and next to it a passing lane it appears. 05.03.19
05.03.19 - The front connection span and where the ramps enter the garage.
The front connection span and where the ramps enter the garage. 05.03.19
05.03.19 - The steel are barriers for the pedestrian walkway at the front of the garage.
The steel are barriers for the pedestrian walkway at the front of the garage. 05.03.19
05.03.19 - Looking back.
Looking back. 05.03.19
05.03.19 - Looking down the connection and into the new garage.
Looking down the connection and into the new garage. 05.03.19
05.03.19 - On the current tram stop side pavers are being installed for the security queues.
On the current tram stop side pavers are being installed for the security queues. 05.03.19
05.03.19 -
05.03.19
05.03.19 - A team is installing the roof sections today.
A team is installing the roof sections today. 05.03.19
05.03.19 -
05.03.19
05.03.19 - A closer look a the paver work.
A closer look a the paver work. 05.03.19
05.03.19 - More landscaping elements are being installed.
More landscaping elements are being installed. 05.03.19
05.03.19 - Preparations for more concrete and pavers near the escalators.
Preparations for more concrete and pavers near the escalators. 05.03.19
05.03.19 - Crates of supplies staged under the canopies.  Guessing roof sections for the canopy.
Crates of supplies staged under the canopies. Guessing roof sections for the canopy. 05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 - Roof sections have been added to some of the 5th floor escalator covers.
Roof sections have been added to some of the 5th floor escalator covers. 05.03.19
05.03.19 - looks like forms for curves going in.
looks like forms for curves going in. 05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 - A closer look at one of th eopen crates.
A closer look at one of th eopen crates. 05.03.19
05.03.19 -
05.03.19
05.03.19 - Vertical gray steel has been added to the stair case exterior.
Vertical gray steel has been added to the stair case exterior. 05.03.19
05.03.19 - The elevator structure has been repainted.
The elevator structure has been repainted. 05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 - A closer look at the new roof sections.
A closer look at the new roof sections. 05.03.19
05.03.19 - The 3rd floor ones are not installed yet.
The 3rd floor ones are not installed yet. 05.03.19
05.03.19 - The tramway to the  left of the temporary walkway has been poured.
The tramway to the left of the temporary walkway has been poured. 05.03.19
05.03.19 -
05.03.19
05.03.19 -
05.03.19
05.03.19 - A wider shot of the area.
A wider shot of the area. 05.03.19
05.03.19 - From the escalator.
From the escalator. 05.03.19
05.03.19 - Preparing for the next concrete pour.
Preparing for the next concrete pour. 05.03.19
05.03.19 - You can see the reverse side of the tram stop briefly.
You can see the reverse side of the tram stop briefly. 05.03.19
05.03.19 - From ground level.
From ground level. 05.03.19
05.03.19 - From the Pixar Pal-A-Round the roof looks almost complete.
From the Pixar Pal-A-Round the roof looks almost complete. 05.03.19
05.03.19 -
05.03.19
05.03.19 - Looks like an elevator in the middle of the structure on the far side.
Looks like an elevator in the middle of the structure on the far side. 05.03.19
05.03.19 - Panning across the garage.
Panning across the garage. 05.03.19
05.03.19 -
05.03.19