03.01.19 - An overview from the Mickey and Friends Tram Stop
An overview from the Mickey and Friends Tram Stop 03.01.19
03.01.19 - Supports for the roof structure have been lifted into place and work on preparing the main structure continues.
Supports for the roof structure have been lifted into place and work on preparing the main structure continues. 03.01.19
03.01.19 - A closer look at the roof structure for the escalator area.
A closer look at the roof structure for the escalator area. 03.01.19
03.01.19 - A cover has been installed over the 2nd floor escalator.
A cover has been installed over the 2nd floor escalator. 03.01.19
03.01.19 - a look at the 3rd floor escalator.  They were installing the side panels.
a look at the 3rd floor escalator. They were installing the side panels. 03.01.19
03.01.19 - A closer look at the 5th floor escalator, side panels are also being installed.
A closer look at the 5th floor escalator, side panels are also being installed. 03.01.19
03.01.19 -
03.01.19
03.01.19 - The 6th floor escalator.
The 6th floor escalator. 03.01.19
03.01.19 - The far elevator structure
The far elevator structure 03.01.19
03.01.19 - Panning across the top to the right to see the roof supports.
Panning across the top to the right to see the roof supports. 03.01.19
03.01.19 -
03.01.19
03.01.19 - A second stair case closer to the elevators has been installed.
A second stair case closer to the elevators has been installed. 03.01.19
03.01.19 - Railings are still being installed.
Railings are still being installed. 03.01.19
03.01.19 - A look at some of the ground level work.
A look at some of the ground level work. 03.01.19
03.01.19 - Scaffolding up so they can work on the ceiling
Scaffolding up so they can work on the ceiling 03.01.19
03.01.19 - Crews preparing the side facing the tram stop for decorative elements.
Crews preparing the side facing the tram stop for decorative elements. 03.01.19
03.01.19 -
03.01.19
03.01.19 - To the right you can see supports being attached for the decorative elements.
To the right you can see supports being attached for the decorative elements. 03.01.19
03.01.19 - This stair well is still awaiting paint.
This stair well is still awaiting paint. 03.01.19
03.01.19 - A closer look at the new supports.
A closer look at the new supports. 03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
03.01.19 - Footers and connection points are taking shape, looks to be for a roof/shade structure
Footers and connection points are taking shape, looks to be for a roof/shade structure 03.01.19
03.01.19 - A look at the structure visible near the center of the garage near the ramp side.
A look at the structure visible near the center of the garage near the ramp side. 03.01.19
03.01.19 - A concrete pumper working on the far side of the garage.
A concrete pumper working on the far side of the garage. 03.01.19
03.01.19 -
03.01.19
03.01.19 - A closer look a the footer.
A closer look a the footer. 03.01.19
03.01.19 - From the escalator.
From the escalator. 03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
03.01.19 - From ground level.
From ground level. 03.01.19
03.01.19 -
03.01.19
03.01.19 -
03.01.19
Back to previous page