02.22.19 - The roof element for the escalator structure is assembled and was being painted on Friday.  A large crane onsite to lift it into place.
The roof element for the escalator structure is assembled and was being painted on Friday. A large crane onsite to lift it into place. 02.22.19
02.22.19 - Crews working on the second floor escalator side structure.
Crews working on the second floor escalator side structure. 02.22.19
02.22.19 - Framing is up for the third floor escalator side structure.
Framing is up for the third floor escalator side structure. 02.22.19
02.22.19 - Framing is also up for the fifth floor one.
Framing is also up for the fifth floor one. 02.22.19
02.22.19 -
02.22.19
02.22.19 - Another crew working ont he sixth floor escalator.
Another crew working ont he sixth floor escalator. 02.22.19
02.22.19 - The dual elevator structures exterior is moving along.
The dual elevator structures exterior is moving along. 02.22.19
02.22.19 -
02.22.19
02.22.19 - Most of the visible forms for the structure facing the tram stop are removed and teams were working on the concrete.
Most of the visible forms for the structure facing the tram stop are removed and teams were working on the concrete. 02.22.19
02.22.19 - A look at the work on the ground level.
A look at the work on the ground level. 02.22.19
02.22.19 - This appears to be where another stair case will be added.
This appears to be where another stair case will be added. 02.22.19
02.22.19 -
02.22.19
02.22.19 - A wide view of the tram stop.
A wide view of the tram stop. 02.22.19
02.22.19 - A better look at the roof structure and large crane.
A better look at the roof structure and large crane. 02.22.19
02.22.19 -
02.22.19
02.22.19 - A wider look at the new structure.
A wider look at the new structure. 02.22.19
02.22.19 - The stairwell looks assembled.  The rails were covered.  So guessing they are going to paint it.
The stairwell looks assembled. The rails were covered. So guessing they are going to paint it. 02.22.19
02.22.19 - In the background the boom for a concrete pumper.  They were working on the roof level in the back section.
In the background the boom for a concrete pumper. They were working on the roof level in the back section. 02.22.19
02.22.19 - Heading down the escalator.
Heading down the escalator. 02.22.19
02.22.19 - The structure on the roof was being framed.
The structure on the roof was being framed. 02.22.19
02.22.19 - Most of the trenches/holes on the ground level are filled in now.
Most of the trenches/holes on the ground level are filled in now. 02.22.19
02.22.19 -
02.22.19
02.22.19 -
02.22.19
02.22.19 - You cannot see much on the ground floor.
You cannot see much on the ground floor. 02.22.19
02.22.19 -
02.22.19
02.22.19 - Looking up at where the roof will attach.  A new metal framework is taking shape inside the circle.
Looking up at where the roof will attach. A new metal framework is taking shape inside the circle. 02.22.19
02.22.19 - From Magic Way.
From Magic Way. 02.22.19
02.22.19 -
02.22.19
02.22.19 -
02.22.19
02.22.19 - The side along Magic Way.
The side along Magic Way. 02.22.19
Back to previous page