01.18.19 - The 5th floor escalators have been installed since my last visit.  The 3rd floor are onsite and waiting to be lifted into place.
The 5th floor escalators have been installed since my last visit. The 3rd floor are onsite and waiting to be lifted into place. 01.18.19
01.18.19 - A closer look at the 2nd floor set.
A closer look at the 2nd floor set. 01.18.19
01.18.19 - Here are the 3rd floor set being prepared for installation.
Here are the 3rd floor set being prepared for installation. 01.18.19
01.18.19 -
01.18.19
01.18.19 -
01.18.19
01.18.19 -
01.18.19
01.18.19 - A closer look at the 4th & 6th floor sets.
A closer look at the 4th & 6th floor sets. 01.18.19
01.18.19 - The far elevator structure.
The far elevator structure. 01.18.19
01.18.19 - The back of the  near elevator structure.
The back of the near elevator structure. 01.18.19
01.18.19 - Teams working on the side of the structure facing the tram stop.
Teams working on the side of the structure facing the tram stop. 01.18.19
01.18.19 - The 6th floor forms are up as you pan to the right.
The 6th floor forms are up as you pan to the right. 01.18.19
01.18.19 -
01.18.19
01.18.19 - A look at the ground level.
A look at the ground level. 01.18.19
01.18.19 - A wider look at the area.
A wider look at the area. 01.18.19
01.18.19 - The forms and supports are all removed from the 6th floor connection span.
The forms and supports are all removed from the 6th floor connection span. 01.18.19
01.18.19 -
01.18.19
01.18.19 - Another look at the ground level.
Another look at the ground level. 01.18.19
01.18.19 -
01.18.19
01.18.19 - Supports and forms are still up on the back connection spans.
Supports and forms are still up on the back connection spans. 01.18.19
01.18.19 - A crew working on the ground level.
A crew working on the ground level. 01.18.19
01.18.19 - Pieces staged and awaiting installation.
Pieces staged and awaiting installation. 01.18.19
01.18.19 - From ground level looking up.
From ground level looking up. 01.18.19
01.18.19 -
01.18.19
01.18.19 - The view from the Pixar Pal-A-Round.
The view from the Pixar Pal-A-Round. 01.18.19
01.18.19 - Panning to th left you can see the support columns for the roof level in the foreground and in the backgroudn it appears another section of the roof has been poured.
Panning to th left you can see the support columns for the roof level in the foreground and in the backgroudn it appears another section of the roof has been poured. 01.18.19
01.18.19 - Continuing to the left you can see forms for the 5th and 6th levels.
Continuing to the left you can see forms for the 5th and 6th levels. 01.18.19
01.18.19 - Concrete was being poured in the back section, hard to tell what.  You can see forms up for the support columns for the 5th and 6th floors.
Concrete was being poured in the back section, hard to tell what. You can see forms up for the support columns for the 5th and 6th floors. 01.18.19