4.29.22 - The third floor temporary decking is mostly up and rebar for the 4th floor support columns is rising up.
The third floor temporary decking is mostly up and rebar for the 4th floor support columns is rising up. 4.29.22
4.29.22 - From across the courtyard the building has not yet risen above the tree line.
From across the courtyard the building has not yet risen above the tree line. 4.29.22
4.29.22 - A look across the site from the left to right.
A look across the site from the left to right. 4.29.22
4.29.22 -
4.29.22
4.29.22 - On the right side forms up around the 4th floor columns
On the right side forms up around the 4th floor columns 4.29.22
4.29.22 - Back to the left side of the project, assuming this is the elevator core
Back to the left side of the project, assuming this is the elevator core 4.29.22
4.29.22 - Further to the right closest the Frontier Tower they are still working on 3rd floor support columns.
Further to the right closest the Frontier Tower they are still working on 3rd floor support columns. 4.29.22