home > Construction Progress > Red Car > 03.02.12
03.02.12 - Walls up around the Red Car stop
Walls up around the Red Car stop 03.02.12
03.02.12 - The other side of the walls
The other side of the walls 03.02.12
03.02.12 - A peek through a gap in the fence.  No bricks installed yet along the rails.
A peek through a gap in the fence. No bricks installed yet along the rails. 03.02.12
Back to previous page