6.18.10 - Scaffolding is goin gup and is visible from the Pier
Scaffolding is goin gup and is visible from the Pier 6.18.10
6.18.10 - The mesh for the rockwork is nearing the top.
The mesh for the rockwork is nearing the top. 6.18.10
6.18.10 - A wider shot
A wider shot 6.18.10
6.18.10 - Now a slow pan from the right side to the left side of the site from the Fun Wheel
Now a slow pan from the right side to the left side of the site from the Fun Wheel 6.18.10
6.18.10 -
6.18.10
6.18.10 -
6.18.10
6.18.10 -
6.18.10
6.18.10 -
6.18.10
6.18.10 -
6.18.10
6.18.10 - Over on the left side of the site they are moving quite a bit of dirt around.
Over on the left side of the site they are moving quite a bit of dirt around. 6.18.10
6.18.10 - The hole for more footers?
The hole for more footers? 6.18.10
6.18.10 - A better shot of the scaffolding.. notice the worker on the left for scale
A better shot of the scaffolding.. notice the worker on the left for scale 6.18.10
6.18.10 - They were out working with the car, but I never saw it go around in my brief look from the Fun Wheel
They were out working with the car, but I never saw it go around in my brief look from the Fun Wheel 6.18.10
6.18.10 - The dirt looks leveled and I am guessing there may be holes under the wood out in the center of the turn around.. or there will be soon for the footers for the rockwork.
The dirt looks leveled and I am guessing there may be holes under the wood out in the center of the turn around.. or there will be soon for the footers for the rockwork. 6.18.10
6.18.10 - Here you can see them drilling and then filling the footers with rebar and concrete for the rockwork on the far side of the land.
Here you can see them drilling and then filling the footers with rebar and concrete for the rockwork on the far side of the land. 6.18.10
6.18.10 -
6.18.10
6.18.10 - The show building is slowly taking shape (or what I am assuming is)
The show building is slowly taking shape (or what I am assuming is) 6.18.10
6.18.10 - A closer look
A closer look 6.18.10
6.18.10 - Notice the workers on top
Notice the workers on top 6.18.10
6.18.10 - It really gives you an idea of the scale of the rockwork (they say 14 months to install it and 12 months to paint/finish it).
It really gives you an idea of the scale of the rockwork (they say 14 months to install it and 12 months to paint/finish it). 6.18.10
6.18.10 - Beyond the rock steel looks like more steel is up, possibly the show building?
Beyond the rock steel looks like more steel is up, possibly the show building? 6.18.10
6.18.10 - One last wide shot
One last wide shot 6.18.10
6.18.10 - Looking over the Pier
Looking over the Pier 6.18.10
6.18.10 - From a different angle you can see the ridge line taking shape.
From a different angle you can see the ridge line taking shape. 6.18.10