12.30.09 - The concrete work for this portion of the track support looks to be done and dirt is being compacted and pushed up to it.
The concrete work for this portion of the track support looks to be done and dirt is being compacted and pushed up to it. 12.30.09
12.30.09 - More dirt being moved around on the far side.
More dirt being moved around on the far side. 12.30.09
12.30.09 - A closer shot, its hard to tell the relief though due to the rain and distance of the shot.
A closer shot, its hard to tell the relief though due to the rain and distance of the shot. 12.30.09
12.30.09 -
12.30.09
12.30.09 -
12.30.09
12.30.09 - A large mound of dirt is off to the left of the site near Bugsland.
A large mound of dirt is off to the left of the site near Bugsland. 12.30.09
12.30.09 - A closer shot of the dirt that is being compressed near the track support
A closer shot of the dirt that is being compressed near the track support 12.30.09
12.30.09 -
12.30.09
12.30.09 -
12.30.09
12.30.09 -
12.30.09
12.30.09 - Still drilling holes and placing rebar along the perimeter of the show building.  Cannot tell if this is for rockwork or for the building.
Still drilling holes and placing rebar along the perimeter of the show building. Cannot tell if this is for rockwork or for the building. 12.30.09
12.30.09 - One last shot of the area.
One last shot of the area. 12.30.09