home > Construction Progress > Cars Land > 02.26.10
02.26.10 - More track is being installed
More track is being installed 02.26.10
02.26.10 -
02.26.10
02.26.10 -
02.26.10
02.26.10 -
02.26.10
02.26.10 - This side looks like it is being prepped for track
This side looks like it is being prepped for track 02.26.10
02.26.10 - Looks like most of the track that has been laying around has been installed.
Looks like most of the track that has been laying around has been installed. 02.26.10
02.26.10 -
02.26.10
02.26.10 - Over to the left looks like more dirt is being moved around, but nothing really taking shape
Over to the left looks like more dirt is being moved around, but nothing really taking shape 02.26.10
02.26.10 - The pit looks about the same, maybe some more markers and pipes visible, but hard to tell.
The pit looks about the same, maybe some more markers and pipes visible, but hard to tell. 02.26.10
02.26.10 -
02.26.10
02.26.10 -
02.26.10
02.26.10 -
02.26.10
02.26.10 - A look around the outside of the site.
A look around the outside of the site. 02.26.10
02.26.10 -
02.26.10
02.26.10 -
02.26.10
Back to previous page