home > Disneyland Resort > Pictures > Sunday, September 11, 2022

This page is to help you quickly jump through this picture set. Below you will see a listing of the pages and the captions on that page.

  • Page Number: 1
    7:11am - In line to park at the Mickey and Friends Parking Structure.
    7:21am - Parked on the Monsters Inc level and on my way.
    Looking toward the Disneyland Hotel from the parking structure.
  • Page Number: 2
    The Paradise Pier Hotel sign has been removed as the hotel is being renovated and changed to the Pixar Place Hotel.
    The Disneyland Hotel Fantasy Tower repainting looks done from this angle.
    The Adventure Tower looks done too.
  • Page Number: 3
    The landscaping and paving project in the former Downtown Disney parking lot that is now used for Cast Member parking is complete.
  • Page Number: 4
  • Page Number: 5
  • Page Number: 6
    7:32am - Arriving at Downtown Disney and through security.
    Grading is underway on the Downtown Disney project a water tank is visible over the wall.
  • Page Number: 7
    A new piece of Coco art celebrating Plaza de la Familia is on the former ESPN building.
  • Page Number: 8
  • Page Number: 9
    A closer look at the Paradise Pier Hotel side.
  • Page Number: 10
    The Monorail was running for early entry Hotel guests.
    The current state of the Jazz Kitchen renovation.
  • Page Number: 11
    Pluto's Pumpkin Pursuit 2022 is underway. Gameboards, Stickers and prizes are available for $9.99 plus tax at several locations. As I walked through I spotted most of the pumpkins (if you are going to do the hunt you may want to skip the next several pa
    Pluto pumpkin
    Princess and the Frog, Tiana, inspired pumpkin.
  • Page Number: 12
    Donald Duck pumpkin.
  • Page Number: 13
    Big Hero 6 artwork from Disney+ Day. The rain the other day washed most of it away.
    Lilo and Stitch pumpkins
  • Page Number: 14
    Daisy Duck pumpkin
  • Page Number: 15
    Mrs. Potts pumpkin
    Pinocchio pumpkin
  • Page Number: 16
    Moana pumpkin
  • Page Number: 17
    The game board sign near World of Disney. There are 13 pumpkins it appears. I managed to find 10 on my quick walk through this morning.
    Mickey Mouse pumpkin
  • Page Number: 18
    La Brea Bakery window
    Minnie Mouse pumpkin
  • Page Number: 19
    7:48am - Entering Disneyland.
  • Page Number: 20
    Main Street USA this morning.
    Signs to direct early entry guests
  • Page Number: 21
    Early entry is on the Tomorrowland side and several cast members are there to verify your hotel stay and let you in.
    Non-hotel guests waiting for the 8am opening.
  • Page Number: 22
    Matterhorn this morning.
    8:00am and the herd is on the move into the park.
  • Page Number: 23
    I turned around and headed toward Town Square.
    Stopped by refreshment corner to sit for a minute and reply to a couple emails.
    Main Street Transportation started running as soon as the park opened and the crowd cleared.
  • Page Number: 24
    Donald Duck in his Halloween costume in Town Square this morning.
  • Page Number: 25
  • Page Number: 26
    8:12am - Exiting toward Harbor Blvd.
    A little hard to see.. but in the distance are a couple people sleeping on the sidewalk. Always a nice welcome to Anaheim.
    Passing by the Candy Cane Inn which has not reopened following their COVID closure then extended renovation. I had a reservation to stay there but it was cancelled a several weeks ago.
  • Page Number: 27
    The back side of Cars Land from Katella.
    5:56pm - Walking back after my day at the D23 Expo. The Downtown Disney parking entrance on Disneyland Drive.
    The sign on this side of the Paradise Pier Hotel is also gone.
  • Page Number: 28
    As are the covers for the lights.
    Stopped by the hotel.
    No noticeable changes inside.
  • Page Number: 29
    An out of service elevator.
    The New DVC tower in the distance, Frontier Tower on the left.
  • Page Number: 30
    The scrim was removed form the fence at the Downtown Disney project offering a ground level view of the project.
    Grading is underway as the prepare the site for construction.
  • Page Number: 31
    A wide view of the site.
    This wraps up my post, after this walked over to the parking structure to find the rest of my group and my car to head home.
Back to previous page