12.30.09 - From across the Bay you can see some cross beams have been installed.
From across the Bay you can see some cross beams have been installed. 12.30.09
12.30.09 - A closer look
A closer look 12.30.09
12.30.09 - Also some beams connecting the new poles to the main structure have been installed.
Also some beams connecting the new poles to the main structure have been installed. 12.30.09
12.30.09 - Looks like new scaffolding being set up.
Looks like new scaffolding being set up. 12.30.09
12.30.09 - Welding continued in the rain.
Welding continued in the rain. 12.30.09
12.30.09 - No visible progress here except plastic on the roof to help protect it from the rain.
No visible progress here except plastic on the roof to help protect it from the rain. 12.30.09
12.30.09 - From the Fun Wheel.
From the Fun Wheel. 12.30.09
12.30.09 - How the new columns are bolted to the concrete footers. (Also notice the design work, that is where the first floor will be.
How the new columns are bolted to the concrete footers. (Also notice the design work, that is where the first floor will be. 12.30.09
12.30.09 - Here you can see all the scaffolding that is being added.
Here you can see all the scaffolding that is being added. 12.30.09
12.30.09 -
12.30.09
12.30.09 -
12.30.09
12.30.09 -
12.30.09
12.30.09 - Now a pan from left to right
Now a pan from left to right 12.30.09
12.30.09 -
12.30.09
12.30.09 - Pipes to be installed
Pipes to be installed 12.30.09
12.30.09 -
12.30.09
12.30.09 - A couple shots from the SS Rustworthy
A couple shots from the SS Rustworthy 12.30.09
12.30.09 -
12.30.09