7.30.10 - The exterior is moving along.  More details are slowly emerging.
The exterior is moving along. More details are slowly emerging. 7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 - Moving around front the steel work looks done and the roof is on.  Framing is next for the large entrance.
Moving around front the steel work looks done and the roof is on. Framing is next for the large entrance. 7.30.10
7.30.10 -
7.30.10
7.30.10 - Insulation is visible on a section the have not closed up yet.
Insulation is visible on a section the have not closed up yet. 7.30.10
7.30.10 - Framing on the top back side is moving along
Framing on the top back side is moving along 7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 - This side of the building is ready for the exterior wall.
This side of the building is ready for the exterior wall. 7.30.10
7.30.10 -
7.30.10
7.30.10 - From the Zephyr
From the Zephyr 7.30.10
7.30.10 -
7.30.10
7.30.10 - From the Fun Wheel
From the Fun Wheel 7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 - From across the bay
From across the bay 7.30.10
7.30.10 - A second pass on the Fun Wheel
A second pass on the Fun Wheel 7.30.10
7.30.10 - Some more from Ground Level, notice the stairs to the second floor spaces, wonder if these will be offices since the ones that were in this area before were demolished to make room
Some more from Ground Level, notice the stairs to the second floor spaces, wonder if these will be offices since the ones that were in this area before were demolished to make room 7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10
7.30.10 -
7.30.10