03.26.10 - The concrete floor on the right half of the attraction looks to be done
The concrete floor on the right half of the attraction looks to be done 03.26.10
03.26.10 - The left side looks to have rebar done in most of it, so probably by next trip it will be done too.
The left side looks to have rebar done in most of it, so probably by next trip it will be done too. 03.26.10
03.26.10 - A closer look
A closer look 03.26.10
03.26.10 -
03.26.10
03.26.10 -
03.26.10
03.26.10 - The furthest left area still does not have the floor rebar in
The furthest left area still does not have the floor rebar in 03.26.10
03.26.10 -
03.26.10
03.26.10 -
03.26.10
03.26.10 -
03.26.10