10.19.18 - The new parking structure escalator structure now has most of the temporary supports removed.
The new parking structure escalator structure now has most of the temporary supports removed. 10.19.18
10.19.18 - A look at the supports for the escalators taking shape.
A look at the supports for the escalators taking shape. 10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 - It appears there will be three escalators following the same floor plan as Mickey and Friends.  One to the 2nd floor, another to floors 3 & 4 and a final one to floors 5 & 6.
It appears there will be three escalators following the same floor plan as Mickey and Friends. One to the 2nd floor, another to floors 3 & 4 and a final one to floors 5 & 6. 10.19.18
10.19.18 - A cloer look at where it looks the top floor will attach.
A cloer look at where it looks the top floor will attach. 10.19.18
10.19.18 - A look at the lower floor, the worker helps to give scale to the project.
A look at the lower floor, the worker helps to give scale to the project. 10.19.18
10.19.18 - The other side this structure will connect to the garage.
The other side this structure will connect to the garage. 10.19.18
10.19.18 - A look across the new structure which is in various stages of progress.
A look across the new structure which is in various stages of progress. 10.19.18
10.19.18 - The connection bridge to the Mickey and Friends Structure has 4 floors poured now and supports for the 5th rising up.
The connection bridge to the Mickey and Friends Structure has 4 floors poured now and supports for the 5th rising up. 10.19.18
10.19.18 - A closer look at the team working on the 4th floor side walls and supports for the 5th.
A closer look at the team working on the 4th floor side walls and supports for the 5th. 10.19.18
10.19.18 - Another team working on the 4th floor of the garage.
Another team working on the 4th floor of the garage. 10.19.18
10.19.18 - In the distance supports on the third floor and beyond that decking for the third floor goin in.
In the distance supports on the third floor and beyond that decking for the third floor goin in. 10.19.18
10.19.18 - A look down on the 4th floor connection span.
A look down on the 4th floor connection span. 10.19.18
10.19.18 - The lower ramp ends at the 4th floor.  The upper ramp is waiting to be extended.
The lower ramp ends at the 4th floor. The upper ramp is waiting to be extended. 10.19.18
10.19.18 - On ground level a cinder block wall is rising up to form a room.
On ground level a cinder block wall is rising up to form a room. 10.19.18
10.19.18 - A worker applying a coating/paint to the concrete further down the ramp.
A worker applying a coating/paint to the concrete further down the ramp. 10.19.18
10.19.18 - The lower ramp to the 4th floor.
The lower ramp to the 4th floor. 10.19.18
10.19.18 -
10.19.18
10.19.18 - Concrete work on another second of the third floor in the distance.
Concrete work on another second of the third floor in the distance. 10.19.18
10.19.18 - A closer look at the second floor connection
A closer look at the second floor connection 10.19.18
10.19.18 - And the third floor connection.
And the third floor connection. 10.19.18
10.19.18 - Heading down the escalator.
Heading down the escalator. 10.19.18
10.19.18 - A look at the ground level work.
A look at the ground level work. 10.19.18
10.19.18 -
10.19.18
10.19.18 - Looking across Magic Way, no sign of where the recently announced pedestrian bridge will go through.
Looking across Magic Way, no sign of where the recently announced pedestrian bridge will go through. 10.19.18
10.19.18 - The sidewalk on this side of the street is covered now so they can work on the bridge.
The sidewalk on this side of the street is covered now so they can work on the bridge. 10.19.18
10.19.18 - Looking up at the escalator structure from street level.
Looking up at the escalator structure from street level. 10.19.18
10.19.18 - The bridge connection will be in this area.
The bridge connection will be in this area. 10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 - Crews working on supports for the 3rd floor along Magic Way.
Crews working on supports for the 3rd floor along Magic Way. 10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 -
10.19.18
10.19.18 - Looks like the second floor is almost extended to the far corner now.
Looks like the second floor is almost extended to the far corner now. 10.19.18
10.19.18 - Looking across the ground level from Magic Way
Looking across the ground level from Magic Way 10.19.18
Back to previous page