09.14.18 - An overview from near the escalator lobby of the Mickey and Friends structure.
An overview from near the escalator lobby of the Mickey and Friends structure. 09.14.18
09.14.18 - A closer look across the new escalator portion of the new garage.
A closer look across the new escalator portion of the new garage. 09.14.18
09.14.18 - Work on the 5th floor continues.
Work on the 5th floor continues. 09.14.18
09.14.18 - The escalator supports and foundations are taking shape.
The escalator supports and foundations are taking shape. 09.14.18
09.14.18 - Looking out across the structure.  1/4 the 3rd floor looks to be up, another 1/4 of the second is taking shape.  The back half cannot be seen from here.
Looking out across the structure. 1/4 the 3rd floor looks to be up, another 1/4 of the second is taking shape. The back half cannot be seen from here. 09.14.18
09.14.18 - The second floor connection to the existing structure has been poured and forms for the 3rd floor are being set up.
The second floor connection to the existing structure has been poured and forms for the 3rd floor are being set up. 09.14.18
09.14.18 - A closer look.
A closer look. 09.14.18
09.14.18 - Looking out on the 3rd floor work.  A large section has been poured already and they are working on the columns for the 4th floor.
Looking out on the 3rd floor work. A large section has been poured already and they are working on the columns for the 4th floor. 09.14.18
09.14.18 - No real visible progress on this section of the ramps.
No real visible progress on this section of the ramps. 09.14.18
09.14.18 - Looking out across the garage.
Looking out across the garage. 09.14.18
09.14.18 - They were working on the side rails for the second ramp today.
They were working on the side rails for the second ramp today. 09.14.18
09.14.18 - On the back half of the garage decking being set up for the 3rd floor.
On the back half of the garage decking being set up for the 3rd floor. 09.14.18
09.14.18 - The back side of the connecting bridge.
The back side of the connecting bridge. 09.14.18
09.14.18 -
09.14.18
09.14.18 - Here you can see work on the far side for the second floor underway.  It has almost reached the far side.
Here you can see work on the far side for the second floor underway. It has almost reached the far side. 09.14.18
09.14.18 - A closer look at the bridge work.
A closer look at the bridge work. 09.14.18
09.14.18 -
09.14.18
09.14.18 - From the escalator.
From the escalator. 09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 -
09.14.18
09.14.18 - From the tram stop the new structure next door.
From the tram stop the new structure next door. 09.14.18
09.14.18 -
09.14.18
Back to previous page