08.22.19 - Looking up at the Mickey and Friends new elevator construction.  The concrete work has finished and steel is being assembled.
Looking up at the Mickey and Friends new elevator construction. The concrete work has finished and steel is being assembled. 08.22.19
08.22.19 - A closer look at the team working on the assembly.
A closer look at the team working on the assembly. 08.22.19
08.22.19 - A ground level view into the new tram plaza project.
A ground level view into the new tram plaza project. 08.22.19
08.22.19 - Pavers are being installed as well as railings.
Pavers are being installed as well as railings. 08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 - The view from the escalator of the new tram drop off location.
The view from the escalator of the new tram drop off location. 08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 - The drop off lanes are taking shape.
The drop off lanes are taking shape. 08.22.19
08.22.19 - On the far side of the project sand is being spread out and compacted for pavers.
On the far side of the project sand is being spread out and compacted for pavers. 08.22.19
08.22.19 -
08.22.19
08.22.19 - A closer look at one of the trees.
A closer look at one of the trees. 08.22.19
08.22.19 - A closer look at the tram drop off area.
A closer look at the tram drop off area. 08.22.19
08.22.19 - The ramp for the tram.
The ramp for the tram. 08.22.19
08.22.19 -
08.22.19
08.22.19 - A closer look at the sand for the pavers.
A closer look at the sand for the pavers. 08.22.19
08.22.19 - An overview of the area.
An overview of the area. 08.22.19
08.22.19 - Moving to the other side of the escalators.
Moving to the other side of the escalators. 08.22.19
08.22.19 - What the 5th floor area for the new elevators looks like.
What the 5th floor area for the new elevators looks like. 08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 - Another look at the steel work.
Another look at the steel work. 08.22.19
08.22.19 -
08.22.19
08.22.19 - More landscaping work is done, not a lot of visible progress on the ramp.
More landscaping work is done, not a lot of visible progress on the ramp. 08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 - Lamp posts are installed along the walkway.
Lamp posts are installed along the walkway. 08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 -
08.22.19
08.22.19 - A wider view of the new bridge.
A wider view of the new bridge. 08.22.19
08.22.19 - A closer look at the sign over Magic Way on the new bridge.
A closer look at the sign over Magic Way on the new bridge. 08.22.19
08.22.19 - A staircase is being added.
A staircase is being added. 08.22.19
08.22.19 - The reverse angle of the tram stop work.
The reverse angle of the tram stop work. 08.22.19
08.22.19 - From ground level at the corner of Magic Way and Disneyland Drive.
From ground level at the corner of Magic Way and Disneyland Drive. 08.22.19
08.22.19 - Looks like signs will be added to this side of the bridge too.
Looks like signs will be added to this side of the bridge too. 08.22.19
08.22.19 -
08.22.19
08.22.19 - A better view of the stairs.
A better view of the stairs. 08.22.19
08.22.19 - More landscaping work underway.
More landscaping work underway. 08.22.19
08.22.19 - A closer look at the new sign.
A closer look at the new sign. 08.22.19