03.08.19 - The large roof section is still on the ground waiting to be raised into position.
The large roof section is still on the ground waiting to be raised into position. 03.08.19
03.08.19 - A larger steel support structure is being assembled overhead.
A larger steel support structure is being assembled overhead. 03.08.19
03.08.19 - A crew working on the supports.
A crew working on the supports. 03.08.19
03.08.19 - Not much visible progress with the escalators.
Not much visible progress with the escalators. 03.08.19
03.08.19 - The support columns are being painted white.
The support columns are being painted white. 03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
03.08.19 - A closer look at the support structure taking shape.
A closer look at the support structure taking shape. 03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
03.08.19 - The cover and some scaffolding are removed from the elevator structure.
The cover and some scaffolding are removed from the elevator structure. 03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
03.08.19 - On ground level a lot of conduit work is underway.
On ground level a lot of conduit work is underway. 03.08.19
03.08.19 -
03.08.19
03.08.19 - Crews are installing supports for the exterior design elements
Crews are installing supports for the exterior design elements 03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
03.08.19 - Working on the roof of the 5th level.
Working on the roof of the 5th level. 03.08.19
03.08.19 - A better look at the conduit work.
A better look at the conduit work. 03.08.19
03.08.19 - Work is progressing on the staircase.
Work is progressing on the staircase. 03.08.19
03.08.19 -
03.08.19
03.08.19 - A wide view of the tram area.
A wide view of the tram area. 03.08.19
03.08.19 - Siding being added to the structure in the center of the garage.
Siding being added to the structure in the center of the garage. 03.08.19
03.08.19 -
03.08.19
03.08.19 - Looks like they are applying/installing the non stick surface.
Looks like they are applying/installing the non stick surface. 03.08.19
03.08.19 - No visible change on the footers.
No visible change on the footers. 03.08.19
03.08.19 - Unpacking crates containing the steel for the supports.
Unpacking crates containing the steel for the supports. 03.08.19
03.08.19 - From the escalator.
From the escalator. 03.08.19
03.08.19 -
03.08.19
03.08.19 - On the ground levle more framing up on the ceiling.
On the ground levle more framing up on the ceiling. 03.08.19
03.08.19 -
03.08.19
03.08.19 - From ground level.
From ground level. 03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
03.08.19 -
03.08.19
Back to previous page