06.30.23 - The bridge towers have been installed since my last visit.
The bridge towers have been installed since my last visit. 06.30.23
06.30.23 - Approaching the area the two new bridge towers are visible.
Approaching the area the two new bridge towers are visible. 06.30.23
06.30.23 - The service gate for the bakery
The service gate for the bakery 06.30.23
06.30.23 - All the scaffolding on the lower portion of the water side is now removed
All the scaffolding on the lower portion of the water side is now removed 06.30.23
06.30.23 - The San Franksokyo sports teams
The San Franksokyo sports teams 06.30.23
06.30.23 - Walls are up blocking access to the bridge, also notice the work boat.  With the attraction running the water level is low but at night when they work the level will be up and they can board easier.
Walls are up blocking access to the bridge, also notice the work boat. With the attraction running the water level is low but at night when they work the level will be up and they can board easier. 06.30.23
06.30.23 - A lift parked on the bridge
A lift parked on the bridge 06.30.23
06.30.23 -
06.30.23
06.30.23 - A closer look at one of the towers.
A closer look at one of the towers. 06.30.23
06.30.23 - Where the tower is bolted to the foundation
Where the tower is bolted to the foundation 06.30.23
06.30.23 - Cast members signed the covered beams
Cast members signed the covered beams 06.30.23
06.30.23 - Conduit is being installed for the bridge lighting
Conduit is being installed for the bridge lighting 06.30.23
06.30.23 - The view from near the coffee cart
The view from near the coffee cart 06.30.23
06.30.23 - From the walkway to Pixar Pier
From the walkway to Pixar Pier 06.30.23
06.30.23 - Scaffolding is still up on this portion of the building.
Scaffolding is still up on this portion of the building. 06.30.23
06.30.23 - Work on the new beer window continues
Work on the new beer window continues 06.30.23
06.30.23 - Grizzly Peak is well hid in the forest from this angle.
Grizzly Peak is well hid in the forest from this angle. 06.30.23
06.30.23 - Here you can see some of the cast signatures.
Here you can see some of the cast signatures. 06.30.23
06.30.23 - A closer look
A closer look 06.30.23
06.30.23 -
06.30.23
06.30.23 - No visible progress on the sign here.
No visible progress on the sign here. 06.30.23
06.30.23 - The drinking fountains are still walled off
The drinking fountains are still walled off 06.30.23
06.30.23 - From near the Bakery
From near the Bakery 06.30.23
06.30.23 -
06.30.23
06.30.23 - Another view of the boat
Another view of the boat 06.30.23
06.30.23 -
06.30.23
06.30.23 - More signatures on this side of the beam
More signatures on this side of the beam 06.30.23
06.30.23 - The facade is taking shape on the new beer window.
The facade is taking shape on the new beer window. 06.30.23
06.30.23 -
06.30.23
06.30.23 - A switchback queue set up to order. No seating in this area now due to the wall and queue.
A switchback queue set up to order. No seating in this area now due to the wall and queue. 06.30.23
06.30.23 - Looks like paneling on this side is all installed too.
Looks like paneling on this side is all installed too. 06.30.23
06.30.23 - No visible progress on the meet and greet space.
No visible progress on the meet and greet space. 06.30.23
06.30.23 -
06.30.23