01.27.23 - Work has started on the footers for the bridge towers.
Work has started on the footers for the bridge towers. 01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
01.27.23 - Assuming this is the excavated dirt.
Assuming this is the excavated dirt. 01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
01.27.23 - From the dining area side of the basin.
From the dining area side of the basin. 01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
01.27.23 -
01.27.23
Back to previous page