03.08.08 - Looking out over the site, they have the boards in to start the second floor, next will come the rebar then concrete..
Looking out over the site, they have the boards in to start the second floor, next will come the rebar then concrete.. 03.08.08
03.08.08 - Looking left
Looking left 03.08.08
03.08.08 - and then right
and then right 03.08.08
03.08.08 - A forklift parked down below by the base of the crane
A forklift parked down below by the base of the crane 03.08.08
03.08.08 - Rebar appears to be down for the far side, which looks to be a ramp.
Rebar appears to be down for the far side, which looks to be a ramp. 03.08.08
03.08.08 - A closer look
A closer look 03.08.08
03.08.08 -
03.08.08
03.08.08 -
03.08.08
03.08.08 - From a bit higher...
From a bit higher... 03.08.08
03.08.08 -
03.08.08
03.08.08 - From the Sun Wheel you can see how the second floor is supported.
From the Sun Wheel you can see how the second floor is supported. 03.08.08
03.08.08 - One last look.
One last look. 03.08.08