4.19.24 - The Parkside Market steel looks to all be in place, the crane is no longer visible.
The Parkside Market steel looks to all be in place, the crane is no longer visible. 4.19.24
4.19.24 - The wall facing the Monorail beam is being framed.
The wall facing the Monorail beam is being framed. 4.19.24
4.19.24 - Here you can see the roof supports are in place.
Here you can see the roof supports are in place. 4.19.24
4.19.24 - The scrims were rolled up on the concrete project. You can see the forms and rebar are in place and awaiting concrete to be poured.
The scrims were rolled up on the concrete project. You can see the forms and rebar are in place and awaiting concrete to be poured. 4.19.24
4.19.24 -
4.19.24
4.19.24 - Earl of Sandwich has not opened yet.
Earl of Sandwich has not opened yet. 4.19.24
4.19.24 - The facade continues to take shape.
The facade continues to take shape. 4.19.24
4.19.24 - A structure on the roof to hide the equipment.
A structure on the roof to hide the equipment. 4.19.24
4.19.24 -
4.19.24
4.19.24 - Looking toward the new security checkpoint.
Looking toward the new security checkpoint. 4.19.24
4.19.24 -
4.19.24
Back to previous page