10.21.11 - The walkway is open between the Adventure Tower and E-Ticket Pool now
The walkway is open between the Adventure Tower and E-Ticket Pool now 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - Is this a new sign out front?  I do not remember it.
Is this a new sign out front? I do not remember it. 10.21.11
10.21.11 -
10.21.11
10.21.11 - Work is moving along on this section (the left hand side)
Work is moving along on this section (the left hand side) 10.21.11
10.21.11 - Over to the pool area, more landscaping is in and tile work is in the spa and pool
Over to the pool area, more landscaping is in and tile work is in the spa and pool 10.21.11
10.21.11 - A wide shot of the area, notice some of the walls on the far side are down.
A wide shot of the area, notice some of the walls on the far side are down. 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - Plants waiting to be planted
Plants waiting to be planted 10.21.11
10.21.11 - The pool entrance from the Adventure Tower.  The walls are down, just low barriers remain.
The pool entrance from the Adventure Tower. The walls are down, just low barriers remain. 10.21.11
10.21.11 - The old pool entrance on the corner near Downtown Disney
The old pool entrance on the corner near Downtown Disney 10.21.11
10.21.11 - A better shot of the entrance from the Adventure Tower
A better shot of the entrance from the Adventure Tower 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - A closer look at the tile work.
A closer look at the tile work. 10.21.11
10.21.11 - Walking on the new walkway you have a great view of the pool.
Walking on the new walkway you have a great view of the pool. 10.21.11
10.21.11 - The entry from the Fantasy Tower is receiving its landscaping.
The entry from the Fantasy Tower is receiving its landscaping. 10.21.11
10.21.11 - A wider shot
A wider shot 10.21.11
10.21.11 - The entry to the Adventure Tower
The entry to the Adventure Tower 10.21.11
10.21.11 - Looking down the steps into the pool area
Looking down the steps into the pool area 10.21.11
10.21.11 -
10.21.11
10.21.11 - The far exterior is moving along
The far exterior is moving along 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - The new planter where the old entrance used to be.
The new planter where the old entrance used to be. 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - Heading into the lobby.  You cannot reach it from the gift shop walkway due to a construction wall in the way.
Heading into the lobby. You cannot reach it from the gift shop walkway due to a construction wall in the way. 10.21.11
10.21.11 - The walls are down by the elevators and the center one is just about done.
The walls are down by the elevators and the center one is just about done. 10.21.11
10.21.11 - Outside looks about the same, no real visible changes.
Outside looks about the same, no real visible changes. 10.21.11
10.21.11 -
10.21.11
10.21.11 - No water again this week, was that a one week trial?
No water again this week, was that a one week trial? 10.21.11
10.21.11 - Here is the backside of that wall we saw as first tried to enter.
Here is the backside of that wall we saw as first tried to enter. 10.21.11
10.21.11 - The front desk has a temporary location on the parking lot side of the lobby while work on the regular side is underway.
The front desk has a temporary location on the parking lot side of the lobby while work on the regular side is underway. 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - A look at the pool area.
A look at the pool area. 10.21.11
10.21.11 - The new walkway
The new walkway 10.21.11
10.21.11 -
10.21.11
10.21.11 - No directory yet
No directory yet 10.21.11
10.21.11 - Went back after dark to check out the lighting.  Here are some shots.
Went back after dark to check out the lighting. Here are some shots. 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11