09.23.11 - Work on the exterior is slowly moving along
Work on the exterior is slowly moving along 09.23.11
09.23.11 - They have started to put finishing touches on the far building.
They have started to put finishing touches on the far building. 09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 - Fences going in atop the new pool wall.
Fences going in atop the new pool wall. 09.23.11
09.23.11 - The spa has been poured
The spa has been poured 09.23.11
09.23.11 - Trees and concrete going in around the E-Ticket pool area.
Trees and concrete going in around the E-Ticket pool area. 09.23.11
09.23.11 - Is that light blue concrete?
Is that light blue concrete? 09.23.11
09.23.11 - A forest being staged on the far side.
A forest being staged on the far side. 09.23.11
09.23.11 -
09.23.11
09.23.11 - Looks like those poles will be the fence line.
Looks like those poles will be the fence line. 09.23.11
09.23.11 - The ramp has been poured too.
The ramp has been poured too. 09.23.11
09.23.11 - A wide shot of the area.
A wide shot of the area. 09.23.11
09.23.11 -
09.23.11
09.23.11 - More plants being brought in.
More plants being brought in. 09.23.11
09.23.11 -
09.23.11
09.23.11 - A closer look at one of the ramps
A closer look at one of the ramps 09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 - Out front of the Adventure tower
Out front of the Adventure tower 09.23.11
09.23.11 -
09.23.11
09.23.11 - Where the temp work lift connected to the Fantasy Tower.
Where the temp work lift connected to the Fantasy Tower. 09.23.11
09.23.11 - The hallway between the Fantasia gift shop and the elevators (the lobby is to the right, the gift shop to the left) was going to open later in the evening according to one of the workers I spoke to.
The hallway between the Fantasia gift shop and the elevators (the lobby is to the right, the gift shop to the left) was going to open later in the evening according to one of the workers I spoke to. 09.23.11
09.23.11 - There were several couches around the lobby area now.
There were several couches around the lobby area now. 09.23.11
09.23.11 - Took a peek into the restrooms on the main level, plain white walls.
Took a peek into the restrooms on the main level, plain white walls. 09.23.11
09.23.11 -
09.23.11
09.23.11 - The old guest relations area.
The old guest relations area. 09.23.11
09.23.11 - Preparing to open the interior walkway to get from the lobby to the convention center.  This was to open later tonight too.
Preparing to open the interior walkway to get from the lobby to the convention center. This was to open later tonight too. 09.23.11
09.23.11 - The main entrance
The main entrance 09.23.11
09.23.11 - Looking through the window you can see they have poured some concrete and have forms up for more.  This area is to open in another week with the fountains a few weeks after that.
Looking through the window you can see they have poured some concrete and have forms up for more. This area is to open in another week with the fountains a few weeks after that. 09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 -
09.23.11
09.23.11 - This is the area right when you walk in those main doors. This was to open tonight too (I was standing right at the barrier).
This is the area right when you walk in those main doors. This was to open tonight too (I was standing right at the barrier). 09.23.11