04.29.11 - The Magic Tower facing the parking lot
The Magic Tower facing the parking lot 04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 - The exterior of the restaurant building is slowly taking shape
The exterior of the restaurant building is slowly taking shape 04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 - The Disneyland sign is now installed on the water slide tower
The Disneyland sign is now installed on the water slide tower 04.29.11
04.29.11 -
04.29.11
04.29.11 -
04.29.11
04.29.11 - Work on the entrance to the Dream tower is moving along.
Work on the entrance to the Dream tower is moving along. 04.29.11
04.29.11 - Our holes through the construction wall are now covered
Our holes through the construction wall are now covered 04.29.11
04.29.11 -
04.29.11
Back to previous page