home > Construction Progress > Cars Land > 10.21.11
10.21.11 - The concrete is starting to be applied to the backside of the range.
The concrete is starting to be applied to the backside of the range. 10.21.11
10.21.11 - A good look at the hand carving going on.
A good look at the hand carving going on. 10.21.11
10.21.11 - The next section being prepped for concrete
The next section being prepped for concrete 10.21.11
10.21.11 -
10.21.11
10.21.11 - Now some Fun Wheel shots.  Starting off with Maters
Now some Fun Wheel shots. Starting off with Maters 10.21.11
10.21.11 - An overview of the area
An overview of the area 10.21.11
10.21.11 - All the scaffolding is down on the radiator cap
All the scaffolding is down on the radiator cap 10.21.11
10.21.11 -
10.21.11
10.21.11 - The courthouse is receiving trim work
The courthouse is receiving trim work 10.21.11
10.21.11 - The final holes on the archway are being patched up.
The final holes on the archway are being patched up. 10.21.11
10.21.11 - A better view of the new rock face.
A better view of the new rock face. 10.21.11
10.21.11 -
10.21.11
10.21.11 - Workers out by the Flying Tires but no signs of testing
Workers out by the Flying Tires but no signs of testing 10.21.11
10.21.11 - No real visible progress on the cones.  Is that a test color panel or they preparing to install the skin.
No real visible progress on the cones. Is that a test color panel or they preparing to install the skin. 10.21.11
10.21.11 -
10.21.11
10.21.11 - Foundation work underway for the remaining cones
Foundation work underway for the remaining cones 10.21.11
10.21.11 - A look at the track area
A look at the track area 10.21.11
10.21.11 - One far section of the backside still waiting for the mesh.
One far section of the backside still waiting for the mesh. 10.21.11
10.21.11 - A pan across the range from left to right
A pan across the range from left to right 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - Now from ground level a look at the work.
Now from ground level a look at the work. 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - Here you can see the patchwork going on.
Here you can see the patchwork going on. 10.21.11
10.21.11 - The corner is looking good.  Should be interesting to see the color transition.
The corner is looking good. Should be interesting to see the color transition. 10.21.11
10.21.11 -
10.21.11
10.21.11 - The walls are down on the side of the old Tortilla factory as the concrete slab that was the base for the silos has been removed.
The walls are down on the side of the old Tortilla factory as the concrete slab that was the base for the silos has been removed. 10.21.11
10.21.11 - A better shot of the new brickwork.
A better shot of the new brickwork. 10.21.11
10.21.11 - From the Blue Sky Cellar area.
From the Blue Sky Cellar area. 10.21.11
10.21.11 - The trees have been moved a bit to give us better shots (thanks!)
The trees have been moved a bit to give us better shots (thanks!) 10.21.11
10.21.11 - The facade is inching along.
The facade is inching along. 10.21.11
10.21.11 - A wide shot of the range
A wide shot of the range 10.21.11
10.21.11 - A look down Route 66
A look down Route 66 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - The rock work looks great
The rock work looks great 10.21.11
10.21.11 - Looks like Maters shack received some paint/stain/sealer?
Looks like Maters shack received some paint/stain/sealer? 10.21.11
10.21.11 - The foundations for Fillmores in the front and Sarges in the back
The foundations for Fillmores in the front and Sarges in the back 10.21.11
10.21.11 - A closer look at Sarges
A closer look at Sarges 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
10.21.11 - The air filter panels are being installed on Flos
The air filter panels are being installed on Flos 10.21.11
10.21.11 -
10.21.11
10.21.11 -
10.21.11
Back to previous page